 Below is the schedule me and Alejandro plan on following for the next 2 months to complete our project in the most organized and efficient way.

Week One:

-Select project route

-Brainstorm plot/soundtrack ideas

-Settle on choice for genre

-Watch short films for inspiration

-Complete blog posts
 
Week Two:

-Further develop story/outline of plot

-Research thriller genre conventions

-Watch more thriller short films for inspiration

-Research desired techniques to implement within the short film

-Write/Start recording 2 pieces for the soundtrack

-Complete blog posts

Week Three:
-Complete rough draft of script

-Research social media pages for similar short films

-Research more desired technique to include within our short film

-Begin storyboard

-Meet with other groups in class

-Find actors and reach out to them

-Create Instagram page

-Complete blog postings

 
Week Four:
-Finalize storyboard

-Settle on shooting locations/get permission to film

-Finish 2 pieces for the soundtrack

-Construct/find needed mise-en-scene elements

-Film opening sequence

 
Week Five (Spring Break):
-Finish filming the short film

-Begin editing

-See if soundtrack pieces work well with the video component

-Post to social media

-Research similar short films and brainstorm ideas for the front and back of the postcard

-Finish blog posts

 
Week Six:
- More editing

-Rewrite/Rerecord any soundtrack songs if necessary

-Find SFX from online databases

-Rough draft postcard

-More social media postings

-CR research

-Complete blog posts

Week Seven:
-Finalize editing/Soundtrack

-More social media postings (Edit potential teasers/bloopers)

-Finalize postcard

-Research for CR/Begin writing CR

-Complete blog posts
 
Week Eight:
-Last touches to short film

-Final social media posts

-Finish writing CR

-Reflect on project as a whole

-Post all components to blog

I really want to take advantage of the free time of spring break to knock out the most intimidating part of the project - filming. Not only does doing so ensure the filming gets done early on, but it also leaves us with a lot of time to edit the project and designate proper time to fulfilling the other project components. I've never really edited an original narrative of this length so I want to make sure I give myself enough time to learn and adjust.

Additionally, I made certain I left time for the whole soundtrack thing because, as I discussed in my last post, something I really hope to do in this project is create an original score. The approach I think would work best is settling on a mood/tone and then writing 2 instrumental tracks and scripting to fit this tone. By knocking out the soundtrack early on, I have more time to write new tracks or change my approach altogether if I feel it doesn't necessarily work.

I didn't use this last year what are you talking about


 

No comments:

Post a Comment

Portfolio Project Schedule

 Below is the schedule me and Alejandro plan on following for the next 2 months to complete our project in the most organized and efficient ...